Ecoworld -- Electricity Home
 Search       Members   Calendar   Help   Home 
Search by username
Not logged in - Login | Register 
Ecoworld -- Electricity > Windmills > Small (less than 100KW) > Electricity Deregulation- Energy Entrepreneurs


  Electricity Forum Home - EcoWorld Forum's Home - EcoWorld Blog - EcoWorld Home

Electricity Deregulation- Energy Entrepreneurs
 Moderated by: EcoAdmin  
 New Topic   Reply   Print 
AuthorPost
Teamrockin
Member
 

Joined: Thu Feb 7th, 2008
Location:  
Posts: 1
Mana: 
 Posted: Thu Feb 7th, 2008 08:42 pm
 Quote  Reply 
My company is an electricity company; the headquarters is located in Houston , Texas . Our normal startup cost is a mere $99.95 one time and $14.95 per month for your website, back office support system, forms, etc … Our promotion cost  for a limited time is $49.95. Our Residual plan is the best there is, for example: For a personal customer (residence) with a kilowatt usage of 2000 per month we will pay you $6.00 monthly residual. If you were in Ignite or Ambit (2nd band - Texas ) you would only earn 50 cents per month residual. If that personal customer were in New York under Ambit (2nd band) you would only earn 10 cents per month residual. We currently offer service in the state of Texas however we will offer service in New York the first quarter of 2008.
Our company will accept Commercial and Apartment customers and new sign up/service customers.  I am one of the Founding Members, contact me if you are serious not curious.

zcl210210
Member
 

Joined: Sun Apr 6th, 2008
Location:  
Posts: 9
Mana: 
 Posted: Sun Apr 6th, 2008 03:07 pm
 Quote  Reply 
4.How much space do I need?                                                                    
This depends upon what size of turbine is installed. For a typical model SW-1500 wind turbine. It is mounted on a 7 meter tilt-up tower. The concrete base is approximately 0.8M x 0.8M x 2M deep. It needs to be in an exposed area with minimum of interruptions from buildings or trees from the prevailing wind direction. It should be mounted at least 20 Meters from nearby buildings or trees. In general a 400mm2 site should be a minimum, depending on shape and orientation to the building. A power cable from the turbine needs to be connected to the battery set or to the mains supply. There is also some electrical equipment which needs to be installed in side your house near to the incoming electrical supply.Senwei Corp is a manufacturer of 200W, 300W,500W,800W,1kW, 2kW, 3kW, 5KW, 10KW, 20KW wind turbine,mill,wind power,generator,small wind turbines,grid off and tie inverter,solar street lamp   http://www.windpowercn.com